Usa Electricity - News, Trends, Usa Electricity Links

1 - 2 of 2

Incorporating solar and wind into the AC grid will be inefficient

Incorporating remote wind and solar, on the other hand, will require an upgraded grid, something entirely different. Our present 345-kilovolt, AC transmission wires can?t do it without unacceptable line losses. We will need to rebuild to 765 kV DC system ? something that could take decades and easily cost several trillion dollars. - Read More

Tags : ac dc electricity grid electricity USA

Areva, Duke Energy Biomass Power Plants in US

Paris-based Areva and Charlotte, N.C.'s Duke Energy announced plans today to jointly develop biomass power plants in the U.S. Areva, primarily a nuclear power developer, and Duke Energy, an electric utility, have formed a joint venture called Adage, with Areva designing and building the biomass plants and a unit of Duke Energy managing operations. - Read More

Tags : areva duke energy biomass power plants USA electricity

Topics : Bioenergy

1 - 2 of 2